Electric fence line running across pasture at sunset with cattle grazing beyond
Powerflex

Split the pasture. Move the herd. Let the rest recover.

Rotational grazing is not complicated, but it is physical. How many paddocks you need, how many cows an acre will carry and what it costs to build all fall out of three numbers and a reel of polybraid.

Draw your ground → Free. No sign-up. Gives you a paddock plan and a costed parts list.
Polybraid on a pigtail post

The rotation in three numbers

Everything else is detail. Get these three right and you have a grazing system; get them wrong and you have a lot of fence in the wrong places.

  • How many paddocks(rest ÷ graze) + 1 — 30 days rest on 3-day moves is 11.
  • How many you buildFour to eight permanent. Subdivide the rest with a reel.
  • How hard you grazeTake half, leave half. The half you leave is what regrows.
The rotational grazing cycle: move livestock regularly to new paddocks, rest the grazed paddocks so vegetation regrows, rest periods build deeper root systems that increase plant nutrients and reduce erosion, and soil health, carbon capture and herd health all improve
The whole cycle in one picture. The herd is concentrated on one paddock while the others recover — and it is the rest, not the grazing, that builds root depth, soil carbon and next month’s feed. Tap the diagram to open it full size.
Step 1

Subdivide — temporary cross-fence

One hot strand on step-in posts, carried on a geared reel, so one person can split a paddock before breakfast and roll it up again after. This is the part you will actually use every day, so buy posts you do not mind handling a hundred times.

Shop step-in postsOne reel and a bundle of posts is the whole starting kit.

Read first: Step-in post spacing and paddock math · Portable electric fence buyer’s guide · Polywire vs polybraid vs rope · Temporary fence posts · Why fiberglass outlasts pigtails · All polybraid · All reels

Step 2

Keep it hot — energizer and grounding

Most failed attempts are not fence failures, they are grounding failures. Plan about three feet of ground rod per output joule, and buy a volt meter at the same time as the energizer — you cannot fix what you cannot measure.

Shop energizersThree ground rods per joule is the rule that saves the most call-outs.

Read first: Charger sizing guide · How to ground an electric fence · Troubleshooting voltage loss · Solar charger sizing by acres · Voltage by species · Brand comparison

Step 3

Water to every paddock

Where most plans stall. Fence twenty paddocks in a week and if eighteen of them have no water, you still have two paddocks. Work the water out before the fence — it is the thing that dictates where the divisions can go.

Shop water systemsPhilmac is IPS-OD — CTS-OD fittings will not seal on SDR11 pipe.

Read first: Livestock water system design · HDPE pipe for direct burial · Stock tank float valves · Keeping water open in winter · HDPE technical reference · All tanks

Step 4

The permanent perimeter

The outside fence and the four to eight permanent divisions are the only parts worth building in hi-tensile. Everything inside them moves. Build this once, properly, and the rotation is just a reel and an afternoon from then on.

Shop perimeter fenceWe do not stock wood brace or corner posts — price those locally.

Read first: The perimeter fence build guide · Complete guide to building electric fence · Fence system comparison · Fence building basics · Notes about insulators · Hi-tensile technical reference

Start with your own ground

Reading about paddock counts only gets you so far. Draw your actual pasture on the map and the builder gives you the division footage, the post count, the charger size and the water run as a costed list you can price, print or put straight in a cart.

Open the Ranch Builder → Free, no sign-up, and the prices refresh against the live catalogue every time you open it.

Or skip the planning and just call us

Tell us the acres, the herd and what you’re trying to change, and we’ll put the parts list together with you — right lengths, right joules, nothing you don’t need. No charge, and it is a lot cheaper than paying freight on a return.

Handy to have in front of you: acres, head count and class of stock, how many paddocks you’re aiming for, and what’s already there for water.

Call or text1-888-251-3934 Emailinfo@powerflexfence.com

Seymour, Missouri — Central time. You get a grazier, not a call centre.

  • Prices shown were pulled live from our catalogue on 8 October 2026 and are the current single-unit or starting price. Case and bundle pricing is on each product page.
  • Paddock counts from (rest ÷ graze) + 1 are a planning starting point, not a stocking rate. Carrying capacity depends on your forage, rainfall and class of stock, and nobody can give you that from a web page.
  • Pallet items, wire reels and 500 ft pipe coils ship LTL freight rather than parcel. Totals quoted anywhere on this site exclude freight and sales tax.